Tel :
86-15905996312Email :
machine@hongancn.com1. After installing the electronic tube, turn on the power for more than 10 minutes.
2. Adjust the timer to test for accuracy of timing and check whether the cover is open or not as timer showing.
3. Check the status of cover open and close, whether the equipment work smoothly (visual inspection).
4. The new machine can be put into normal use after the above steps are normal.