Tel :
86-15905996312Email :
machine@hongancn.com1. Function: Preheating the raw material powder into cake
2. 3KW, 5KW, 10KW preheating machine available
Brand:
Shunhaoitem no.:
10 KWPayment:
LC, TTproduct origin:
ChinaColor:
Greenshipping port:
XiamenMachine Dimension:
1150×820×1720Machine Weight:
600KGTrainning Service:
YesSupport Service:
Life-time ServiceAdvantages of Shunhao Melamine Preheating Machine:
1. Easy to operate, and electric saving.
2. Top brand parts used: Canon tube,Japan Toshiba, Omron, etc.
3. Hard quality & 1-year warranty
4. Strong wooden box packing and safe deliver
5. China High quality preheaters supplier
Technical Parameters
No |
Content. |
HGY-1020 |
1 |
Output10 |
KW |
2 |
Power Source |
3Φ220V 380V 415V |
3 |
Power Input |
20KVA |
4 |
Oscillation Frequency |
27MHZ |
5 |
Vacuum Tube |
8T85RB
|
6 |
Voltage Switching |
3-stage |
7 |
Preheating Power |
110℃ Within 60 secs |
8 |
Phenolic Resin |
6500gr |
9 |
Melamine Moulding Compound |
6000gr |
10 |
Urea Moulding Compound |
6000gr |
■ PS: Specifications subject to change without notice.
How to Install the Canon Tube for the Preheating Machine?
Shunhao Machine & Mould Factory not only produces qualified melamine machines but also supplie the best after-sales service.
You can follow the video above to carefully install the Canon Tube back.
Installation Steps:
1.Take out the glass and place the Canon tube back carefully.
2.Connect other wires or coils with their right place tightly.
FAQ for Melamine Preheater
Q: How can I get the machine I want?
A: We will give professional advice according to the needs of customers' products, customers need to inform all the required details.
Q: Where is your factory located?
A: Our factory is located in Quanzhou,Fujian Province,China.
Q: What's the delivery time for machine?
20-50 days after receiving the deposit, depending on the machine order quantity and machine model.
Q: What is the package for melamine preheating machine?
Due to the light weight of the preheating machine, our company uses wooden box sealed packaging, 100% protection of the machine from moisture and collision. However, it should be noted that when loading or unloading the cabinet, there is no danger of the machine falling. The preheating machine can take the FCL or LCL shipping or air shipping method.
Q: What is the payment term?
30% by TT in advance & 70% by TT after inspection but before shipment.